Contents x
- Quick Guide
- Quality Management
- Post Award - Project Startup & Planning Meeting
- Planning for Quality
- Planning for Quality
- QSM
- Job Setup and Records
- QMP
- Project Quality Schedule
- Design Review
- Hutchies’ Quality and Services Handbooks / Toolbox Resources
- Structures
- Waterproofing
- Facade Submissions
- Fire Compartments and Passive Fire registers/systems
- Life Safety and other Services
- Imported Goods
- Project Requirements Review
- Project Specific Inspection & Test Plans (ITPs)
- Support Teams and Manuals
- Government Performance Ratings on Projects
- Communicating the Plan to Hutchies' Team
- Communicating the Plan to Subcontractors
- Supervision (incl. Quality and Services Teams Support)
- Project Completion and Handover
- Defects Liability Period
- Final Completion
- Post Contract Quality and Statutory Warranties
- Defect Management & Rectification Procedures Flowchart
- Planning and Quality Control Guide
- Definitions
- Overview
- Roles and Responsibilities
- Preparing inspection and Test Plans
- General
- Inspection and Testing Procedures
- Lot and Lot Plan
- Characteristics
- Type and Frequency
- Conformity
- Acceptance Criteria
- Hold and Witness Points
- Checklist
- Corrective Action Report
- Records
- Other Considerations
- References
- Structure
- Level Dimension Tolerance
- Precast
- Precast - General Principles
- Precast Applications
- Design Objectives and Compliance
- Precast design - General
- Precast design - Grouting
- Precast Design - Connections
- Design (Shop) Drawings
- Precast Erection Drawings
- Cast-in Lifting and Bracing Inserts
- Concrete Strength and Curing time
- Manufacture (offsite) - Aesthetic provisions (surface finishes)
- Manufacture (offsite)
- Transport to site
- Installation - Overview
- Wall Bed Install
- Dry pack installation
- Grout Depth Checking
- Grout Testing
- Weatherproofing
- Sealants
- HB-ITP-015 - Precast Concrete
- Summary
- References
- Building Envelope
- External Composite Wall Panel Systems - Selection
- Metal Roofing
- Windows & Doors
- Windows and Doors - General Principles
- 1. Window Design
- 2. Window Selection
- 3. When the Designers Get The Selection Wrong
- 4. Subsills
- 5. Jambs
- 6. Diversion of Facade Runoff
- 7. General Issues - Windows and Doors
- 8. Acoustic Considerations
- 9. Attached Screens
- 10. Maintenance
- 11. Additional Considerations
- References
- Render
- Fire
- Waterproofing
- Services
- Finishes
- Acoustic Separation
- Ceiling & Wall Linings
- Material Moisture
- Material Moisture - General Principles
- 1. Timber - General
- 2. Timber Doors & Windows
- 3. Internal Timber Floors
- 4. External Timber Decks
- 5. Timber Cladding
- 6. Timber - General Items
- 7. Timber Classifications for External Use
- 8. Concrete - General
- 9. Internal Concrete
- 10. External Concrete
- 11. Render
- References
- Pools
- Protection of Finished Surfaces
- Steel Protection
- Steel Protection - General Principles
- 1. Types of Metals Commonly Used in Construction
- 2. What Causes Corrosion?
- 3. Main Types of Corrosion
- 4. Types of Protection Available
- 5. Corrosion Caused by Roof Water Runoff
- 6. Implementation Rules
- 7. Review of Common Steel Corrosion Problems
- 8. Maintenance
- References
- Stairs & Ramps
- Wet Areas
- Wet Area Construction - General Principles
- 1. Substrate Works - Formed Setdowns, Set Up Bathrooms, Wall Linings
- 2. Plumbing Works - Floor (Drainage)
- 3. Plumbing Works - Walls (Drainage/Water Services Penetrations)
- 4. Waterproofing
- 5. Mechanical Ventilation (Refer to Topic 9 Mechanical Services)
- 6. Bath Installation
- 7. Generally
- 8. Tiling
- 9. Inspection/Access Openings
- 10. Bathroom Finishes / Glazing
- 11. Maintenance
- APPENDIX D
- References
- Tools & Information
- Print
- Share
Contents