In summary Precast Concrete works are a HIGH RISK activity and requires considerable planning from start to finish - from design phase to signoff/certification
• Preplan the design carefully
• Check the shop drawings thoroughly
• Supervise all aspects of the works during install and critical hold points
• Check everything yourself – precast compliance is critical (high risk if not completed correctly)
• Have all works inspected and signed off
• Take photos of work in progress as evidence of compliance
GRC façade (similar process)